35 workers are employed to complete a construction in 16 days. the boss needs to complete the project in 14 days. all the workers work at the same rate, how many more workers does he need to employ in order to complete the project on time...? Mcqs

Latest MCQs

35 workers are employed to complete a construction in 16 days. the boss needs to complete the project in 14 days. all the workers work at the same rate, how many more workers does he need to employ in order to complete the project on time...?

(A) 3
(B) 4

(C) 5
(D) 9

Latest MCQs

If a person reads 3/8 of a book in a day. Next day he reads 4/5 of the rest. Now 40 pages are left. How many pages are there in book...?

(A) 240
(B) 320

(C) 360
(D) 380

Latest MCQs

What fraction of a cake remains when 3/8 of the cake has been eaten...?

(A) 2/8
(B) 4/8

(C) 5/8
(D) 6/8

Latest MCQs

Six tenths is the same as:...?

(A) 60
(B) 0.6

(C) 6.0
(D) 0.06

Latest MCQs

What number increased by 20% of itself is equal to 102...?

(A) 85
(B) 90

(C) 75
(D) 185

Latest MCQs

Length and width of a field are in the ratio 5:3. If the width of the field is 42 m then its length is:...?

(A) 100 m
(B) 80 m

(C) 50 m
(D) 70 m

Latest MCQs

If the mean of 7 terms is 40, the sum of those terms will be...?

(A) 280
(B) 480

(C) 200
(D) 346

Latest MCQs

A speed of 14 meters per second is the same as:...?

(A) 45.5 km/h
(B) 50.4 km/h

(C) 52.2 km/h
(D) 55.5 km/h

Latest MCQs

The sum of two numbers is 45. 4 times the first number is 9 less than 5 times the second, what are the two numbers...?

(A) 24 and 21
(B) 22 and 23

(C) 25 and 28
(D) 26 and 21

Latest MCQs

If the average arithmetic mean of 8, 12, 15, 21, x and 11 is 17 then what is x...?

(A) 3
(B) 15

(C) 17
(D) 35

Best of Luck

From ShineGk.com

Share our website's link