A can do a piece of work in 4 hours, B and C can do it in 3 hours. A and C can do it in 2 hours. How long will B alone take to do it...? Mcqs

Latest MCQs

A can do a piece of work in 4 hours, B and C can do it in 3 hours. A and C can do it in 2 hours. How long will B alone take to do it...?

(A) 12 hours
(B) 10 hours

(C) 24 hours
(D) 8 hours

Latest MCQs

√3 / √12 is...?

(A) rational number
(B) irrational number

(C) Natural
(D) Integer

Latest MCQs

423 a divisible by:...?

(A) 21
(B) 47

(C) 17
(D) 43

Latest MCQs

الجبر والمقابلہ کے مصنف کون ہیں ؟...?

(A) بو علی سینا
(B) الخوارزمي

(C) البیرونی
(D) ان میں سے کوئی نہیں

Latest MCQs

P is 6 times greater than Q then by what per cent is Q smaller than P...?

(A) 84%
(B) 85.5%

(C) 83.33%
(D) 80%

Latest MCQs

The volume of a sphere is..?

(A) 4/3 pi r3
(B) 2/3 pi r3

(C) pi r3
(D) 2 pi r

Latest MCQs

42 women can do a work in 18 days how many women required to do the same work in 21 days...?

(A) 34
(B) 35

(C) 36
(D) None of these

Latest MCQs

Aaron has 3 times as much money as Josh. If Aaron gives Josh $50, Josh will then have 3 times as much money as Aaron. How much money do two of them have together?...?

(A) $100
(B) $110

(C) $135
(D) $150

Latest MCQs

Graphical representation of data is called...?

(A) Pie chart
(B) Bar Chart

(C) Line chart
(D) Scatter plot

Latest MCQs

If x = 7 - 4sqrt[3] then find the value of x + [1 / x]...?

(A) 1
(B) 14

(C) 7 + 4sqrt[3]
(D) None of these

Best of Luck

From ShineGk.com

Share our website's link